Putting in underground lines for landscape lighting and irrigation. "That was some hard work," said my dad. |
In the kitchen: Most of the kitchen cabinets are installed and the granite countertop is finished.
On the first floor and in the bathrooms: The tiles will be finished on Monday.
In the laundry room: My parents and sister found cabinets at Ikea and a sink on Amazon. My sister assembled the cabinets on Friday, so they're ready for installation on Tuesday. The tiles are almost finished in the laundry room, too.
On the second floor: We stacked the wood floor boards, so they are ready to be laid- the wood is sustainable eucalyptus.
In the whole house: The walls are painted; the air conditioning is running; lights are in, including special turtle lights.
The elevator is installed and working to connect the three floors!
Heather