Wednesday, October 26, 2016

Walls Started

As soon as the concrete was poured, they started placing the steel for the concrete walls.

Foundation complete


The foundation finally got poured.  They used a 32 meter boom pump to place the concrete.  The foundation has 73 yards of concrete.

And a Hurricane

There have been some minor delays.  The plumber was busy and it took a while before we could get the rough plumbing completed.  Then hurricane Matthew blasted through.  We stopped work and secured everything.  There was no damage to the property, though there was a lot of beach erosion.  Finally, the concrete guys could finish the foundation.

Saturday, September 10, 2016

Tuesday, August 30, 2016

Pilings


The pilings were drilled today.  There are 28 continuous flight auger piles.  The piles are 16 inches in diameter and 30 to 35 feet deep.  It is amazing to see how they install these!  They drill a hole to the pile depth with a hollow auger, then pump concrete under pressure through the drill.  As the auger is removed concrete is pumped to the top of the hole.  Then a steel reinforcing cage is lowered into the wet concrete.



Saturday, August 27, 2016