Sunday, April 16, 2017

Update, roof, framing, A/C, deck

I haven't posted an update in a while.  It isn't that nothing has happened.  I've been so busy that this blog has been neglected.

All of the interior framing is in.  The underside of the roof deck was insulated with closed-cell spray foam.

The aluminum standing seam roof was installed on the upper sloped roof.  It is an Englert Slate Blue. The flat roof deck and the oceanfront balcony are finished with a PVC membrane decking material called DecTec CoolStep.  The air conditioning ductwork was installed.  I installed the piping for the central vacuum system.

Last Friday, the electricians started the interior rough wiring.  It should take them a couple of weeks.  The plumber has been so busy, he keeps pushing his schedule back.  He probably won't start for another week or two (If I'm lucky).

The stucco contractor has started prepping the house, but they can't start until the trades are finished.  They may be able to do part of the work before the plumbers are done.