Friday, December 29, 2017

The House is Hospitable

The house is hospitable!

There is now a real driveway.  Inside the house, the first floor is tiled and the second floor is complete with wood flooring.

The electrical work is completely finished.

The kitchen is practically usable, with electricity, a granite countertop, and half of the appliances.  The cooktop is induction rather than conduction, so it heats the pan using a magnetic field.  The cooktop itself won't get hot!

Earthquake checking out the kitchen.

Additionally, we have access to water, since the installation of plumbing, a water heater, and a water purification system (so the water no longer smells nasty).

On Wednesday, the final survey was performed.  Surveyors checked to make sure the house was in the right spot and each floor was on the right elevation.

We were thankful to have the family home for the holidays and we wish you all a very happy holiday season.  Stay tuned for frequent updates on the construction of an ultramodern beachfront soon-to-be home!

No comments:

Post a Comment