Showing posts with label foundation. Show all posts
Showing posts with label foundation. Show all posts

Wednesday, October 26, 2016

Foundation complete


The foundation finally got poured.  They used a 32 meter boom pump to place the concrete.  The foundation has 73 yards of concrete.

Saturday, September 10, 2016

Saturday, June 11, 2016

Soil Borings

Soil boring were taken down to 40 feet below the surface.  Naturally, the soils are sand with bits of shell. 
Once the density and type of soil was known, I was able to design the size and depth of the foundation pilings.