Sunday, November 13, 2016

Concrete Walls


The first floor concrete walls have been poured.  Check out the view from the first floor.  I can't wait to see the second floor view!

Wednesday, October 26, 2016

Walls Started

As soon as the concrete was poured, they started placing the steel for the concrete walls.

Foundation complete


The foundation finally got poured.  They used a 32 meter boom pump to place the concrete.  The foundation has 73 yards of concrete.

And a Hurricane

There have been some minor delays.  The plumber was busy and it took a while before we could get the rough plumbing completed.  Then hurricane Matthew blasted through.  We stopped work and secured everything.  There was no damage to the property, though there was a lot of beach erosion.  Finally, the concrete guys could finish the foundation.

Saturday, September 10, 2016