Tuesday, August 30, 2016

Pilings


The pilings were drilled today.  There are 28 continuous flight auger piles.  The piles are 16 inches in diameter and 30 to 35 feet deep.  It is amazing to see how they install these!  They drill a hole to the pile depth with a hollow auger, then pump concrete under pressure through the drill.  As the auger is removed concrete is pumped to the top of the hole.  Then a steel reinforcing cage is lowered into the wet concrete.



Tuesday, August 23, 2016

Gold Dust

We brought in 14 loads of fill today.  The dirt has to be approved as compatible with the existing beach dune sand.  Therefore, the stuff is trucked in from Vero Beach and costs like it is flecked with gold!